Project statuses: update

Carolane Michaux -

 

With the apparition of the HTML page, we have adapted the list of statuses of the points, that you can reach when you create / edit a project.

 

 

 

Each of the 3 columns of the html page is defined like this :

  • When you check a status (example : status in progress) with the box html to do, the sub-contractor can see this way in his html page all the points (tasks) he has to accomplish. (Tab 1 of the html page).

 

  • When you check a status with the box html done, (example : the status checked). the sub-contractor can see this way in his html page all the points (tasks) he accomplished. (Tab 2 of the html page).

 

  • When you check a status with the button done, the sub-contractor has the possibility to click on the done button, so that he can update the point as accomplished. (Tab 1 of the html page). Only a status can be assigned to the done button.

 

 